My Journey
National Informatics Centre (NIC)
AI Software Intern
January 2025 – April 2025
At NIC, I was instrumental in developing a cutting-edge AI chatbot to enhance vehicle registration support for users nationwide. My contributions spanned the full development lifecycle:
- AI-Powered Chatbot Development:
- Designed and implemented a chatbot leveraging advanced NLP and large language models (LLMs) to deliver accurate, natural language responses.
- Integrated real-time analytics to monitor user interactions, providing actionable insights for continuous improvement.
- Backend Engineering:
- Engineered scalable backend services using FastAPI, optimizing for high performance and reliability even under significant traffic.
- Strengthened security with CAPTCHA verification and robust access controls, safeguarding sensitive user data and preventing automated threats.
- Data Visualization:
- Developed interactive dashboards and visualizations, empowering both users and administrators to interpret analytics and drive service enhancements.
- Cross-Functional Collaboration:
- Worked closely with UI/UX designers and data engineers to deliver a seamless, intuitive user experience and a robust backend infrastructure.
Gurugram Metropolitan Development Authority (GMDA)
Full-Stack Intern
June 2022 – August 2022
At GMDA, I played a pivotal role in modernizing the internal dashboard for city planners and administrators:
- UI/UX Revamp:
- Redesigned the dashboard’s frontend using Bootstrap and JavaScript, resulting in a responsive, accessible, and visually cohesive interface across devices and platforms.
- Prioritized usability improvements to reduce cognitive load and streamline workflows for end users.
- Backend Integration:
- Collaborated with backend engineers to automate data workflows, significantly reducing manual data entry and enhancing operational efficiency.
- Assisted in developing RESTful APIs to ensure seamless data exchange between the dashboard and backend systems.
- Project Impact:
- The upgraded dashboard accelerated decision-making and improved resource allocation for critical city infrastructure projects.